Wednesday, October 2, 2013

Preparing for Moving Day

We really like our truck.









We had a new hitch installed in the truck. A Reese slider. Picked up a new 10 inch Teflon disk, and connected it to the RV. I had to test the new 7 way plug that we had installed. Also I wanted to see how much the weight of the rig affected the tire clearance, etc.





Everything looked and worked as it should. Lights, brakes, and it sat level too.

I'm happy.

We then went for a road trip to Barstow and back. We put a little over 300 miles on the truck. This is the break in period. I think we are ready to tow.



After 13 nights in Bakersfield, we are ready to move on.

No comments:

Post a Comment